Chapter 12 Verification
Outlook
Open items before operation, technical development and transferability
Before mains operation in everyday training, two items are outstanding: the replacement of the miniature circuit breaker -F2 and the initial inspection by a qualified electrician. Technically still open are the comparison with real measurement data, the formal specification of the plugin interface, an assured cycle and the didactic preparation of further plants. The architecture is not limited to the heated tank.
Before mains operation
The miniature circuit breaker -F2 is to be replaced with a two-pole one; after that follows the initial inspection by a qualified electrician (Chapter 7). Both steps are prerequisites for operation in everyday training.
Technically open
The following points result from the limits in Chapter 11:
Transferability
The architecture does not depend on the heated tank. A model merely needs the interface compute_step (Chapter 6); the number of signals and the physics behind it are free. Any plant that can be controlled via digital inputs and outputs can thus be replicated, from the elevator to the filling plant. That this works beyond the heated tank is shown by the twelve further models on the same platform.